Application Product all kinds of standard bricks, hollow blocks, porous brick, the road brick, road-edge bricks, tiles for concrete products.
1.The design and manufacture of Qj16-15 Absorbing the world's highest standard in technology.Based on the traditional equipment,Reduce investment about 30%, the yield increased by 35% and reduce energy consumption by 15% or so;
2.Replace the abrasive, not only can produce block bricks, and produce street brick, curbs, river brick and hydraulic products, you can choose the level of the second feeding system, to increase the color effects, the formation of colorful tiles.
3.adopt Independent integrated hydraulic station, to Avoid host vibration, dust on the influence of the hydraulic system;
4.The compressive strength of block products produced up to 15Mpa MPa or more, High compactness, antifreeze, anti-permeability function good, sound insulation, heat insulation, heat preservation function fine, shape and size precise
|
parameter values |
|
The biggest envelop dimensions |
6600×1990×3000(L×W×H)(mm) |
|
Hydraulic system pressure rated |
21Mpa |
|
Main vibration form |
Sets and vibration moulding |
|
vibration frequency |
50~70Hz |
|
vibration acceleration |
10-15g |
|
Adapt to high brick |
50-200mm |
|
pallet size |
wooden |
830×660×(40±1)(mm) |
|
Iron Steel |
830×660×(8-10±1)(mm) |
|
|
830×660×(15-20)(mm) |
molding cycle |
15 to 20 seconds, needing fabric 20-25 seconds |
|
hourly output |
(240×115×53mm) |
43200-57600 pieces of / 8 hours |
Charging device capacity |
The hopper effective volume 0.45 m3 |
|
|
Charging car effective volume 0.15 m3 |
|
Whole machine power |
36.8kw |
|
Overall weight |
12000kg |
Project |
Blocks specifications (mm) |
Molding number (piece ) |
Shape cycle (SEC) |
In class, 8 hours (piece ) |
Host power (kw) |
QTj6-15 |
390×190×190 |
6 |
15-20 |
8640-11500 |
36.8 |
240×115×90 |
15 |
15-20 |
21600-28800 |
||
240×115×53 |
30 |
15-20 |
43200-57600 |
||
·This series products have 150-650 tons of different specifications. · abnormity brick mold can be based on user needs to prepare. |
Production conditions |
||
Productive land
|
Venues |
5-10 acres |
Operation shed |
60 |
|
Raw space |
300 |
|
office occupancy |
30 |
|
|
staff |
8-10 people |
staff |
40kw |
|
water deprivation |
10 T/day |